MLS #2352011 / Listing provided by NWMLS & John L. Scott, Inc..
$2,750,000
240 W Lake Sammamish Parkway SE
Bellevue,
WA
98008
Beds
Baths
Sq Ft
Per Sq Ft
Year Built
W Lake Sammamish Modern stunner! Built w utmost attention to detail - exceptional floorplan, soaring high ceilings, high-end finishes & stunning lake views. Elevated 14' ceilings in entry, as you step into your light-filled great rm you are greeted by a wall of windows that offers lake & mountain views. Chef's kitchen with designer grade appliances & waterfall island. 2 stunning primary suites (one on each level) accomodates multigenerational living! Covered patio & massive deck makes this yard functional & low maintenance, imagine the summer bbq's! Get a better than new home with interior & landscaping upgrades that you will never see with new construction homes. Off a private dead-end lane, this is your city escape!
Disclaimer: The information contained in this listing has not been verified by Hawkins-Poe Real Estate Services and should be verified by the buyer.
Bedrooms
- Total Bedrooms: 4
- Main Level Bedrooms: 2
- Lower Level Bedrooms: 2
- Upper Level Bedrooms: 0
- Possible Bedrooms: 4
Bathrooms
- Total Bathrooms: 4
- Half Bathrooms: 0
- Three-quarter Bathrooms: 1
- Full Bathrooms: 3
- Full Bathrooms in Garage: 0
- Half Bathrooms in Garage: 0
- Three-quarter Bathrooms in Garage: 0
Fireplaces
- Total Fireplaces: 1
- Main Level Fireplaces: 1
Water Heater
- Water Heater Location: Garage
- Water Heater Type: Tankless
Heating & Cooling
- Heating: Yes
- Cooling: Yes
Parking
- Garage: Yes
- Garage Attached: Yes
- Garage Spaces: 2
- Parking Features: Attached Garage, Off Street
- Parking Total: 2
Structure
- Roof: Composition, Flat
- Exterior Features: Cement Planked
- Foundation: Poured Concrete
Lot Details
- Lot Features: Dead End Street, Paved
- Acres: 0.21
- Foundation: Poured Concrete
Schools
- High School District: Bellevue
- High School: Interlake Snr High
- Middle School: Highland Mid
- Elementary School: Bennett Elem
Lot Details
- Lot Features: Dead End Street, Paved
- Acres: 0.21
- Foundation: Poured Concrete
Power
- Energy Source: Electric, Natural Gas
- Power Company: PSE
Water, Sewer, and Garbage
- Sewer Company: City of Bellevue
- Sewer: Sewer Connected
- Water Company: City of Bellevue
- Water Source: Public

Amy Flippo
Broker | REALTOR®
Send Amy Flippo an email